Construction Method Of Fiberglass Mesh In Exterior Wall Insulation

- Jan 16, 2019-

Construction method of fiberglass mesh in exterior wall insulation 

Put the stick cotton toward the interior side from the roof to the wall foot, with double-sided adhesive fiberglass mesh cloth fixed on the bottom of the purlins and leaving another 20 cm.

Truncate the fiberglass mesh cloth when it is 20 cm over the top of wall purlin, and fix it with double-sided adhesive tape.

Close the mesh edge and install color plate.

Keep attentions of the glass fiber mesh cloth tension, alignment and the close seams between rolls. According to JBJ26-95 "civil building energy-saving design standard" in the same area, glass cotton selection criterion is different.