How To Assemble?

- Apr 23, 2018-

Recommended assembly method:

1. Operation at ambient temperatures between 15 and 25ºC
2. Work surfaces should be clean and dry, free of dust, grease, oil and any other loose matter
3. Remove the protective release paper taking care not to touch the adhesive
4. Place the hanger in the required position and press the base against the surface to be insulated
5. Insulation can be impaled immediately and firmly locked with fastening clips but maximum strength of adherence is achieved after 24 hours


news1932.jpg

Previous:Application Of Insulation Nails Next:How To Choose Available Size Of Heat Insulation Nail?